Pivnichnyi MPP PJSC (METINVEST)
“We express our gratitude to EA SOLUTIONS LLC for the technical re-equipment of the pump drive units and turbine-driven blower of the ore dressing plant №2 on a turnkey basis. One of the project results is reduction of electric energy consumption by 30% which allows to save 115 th.kW*/h per month.”
Head of the Energy Management Department
K.A. Savchuk